You Have 0 Item in your Cart. Price is £0.00

Blog2

11 Aug

Dewatering

Dewatering Adil saeed Al Harbi has expertise in deep well dewatering and groundwater control, with equipment and services for both hire and sale of diesel centrifugal pumps and bore hole deep will pumps. Our dewatering pumps and deep well submersible pumps are proven for the thoughest ground water applications at the most demanding locations.

Read More
23 Jan

Constructions

Construction of large mega and multi bathing and wasting spaces for the Hajj pilgrims in Jamrat area Makkah, the project successfully completed 2009. The project was very tight-schedule and time-bound. Then building construction work consists of concrete frame structure. Foundation, column, beams and slab all completely requires heavy steel reinforcement work, massive concrete pouring work

Read More
23 Jan

Earthwork

The group. Has been a leader group in the field of backfilling, Leavling and Excavation 7 Earth works in Jeddah and out of Jeddah. The Group has executed many projects in these fields achieving high level of specifications and quality. Because of the professional, technical & administrative staff. In addition to the heavy equipment that

Read More
23 Jan

Breakwater

In ongoing projects, a project is underway for the breakwater material with Hyundai Heavy Industries (HHI) at Jeddah south termal power plant (JSTPP) project. Provision and supply of different breakwater material layers. Which includes Secondary armor layer and Rock primary armour layer at the project site. The hard rock stone is supplied from …

Read More
23 Jan

Rock Blasting

Due to danger and sensitivity resulting from blasting works, and seeking primarily for safety, the group has set a number of procedures and precautions necessary for the security and safety of individuals and properties in work places, and as the department need machines of special specifications, the group has contracted with biggest companies …

Read More
23 Jan

Pipeline & Cable laying

Pipeline and cable laying project in Yanbu industrial city; the project completed successfully in 201. The laying of pipeline includes the 92 cm internal dia max size pipes. The project includes 20,000m of different size of pipes in the industrial area for various purposes. The details of project work ranges from excavation in all types

Read More
Designed & Developed by Prolines.sa, Hosted by Saudihost